The 2nd Tie in the Christmas Tree Skirt

I finished knitting the 2nd tie a few days ago, but I didn’t have a chance to block it and take pictures of it till last night.

It’s a little difficult to see, since I took these pictures in our basement. I’ll have better pictures by next week when I bring it upstairs after seaming it together with my 1st tie.

In addition to knitting this tie, I have been trying to knit at least 2 rows on my AWHF Beaded Shawl every day. After completing the 2 rows this morning, I decided to count how many beads I had left to weave on. 168. It might seem like a lot, but that means I only have 36 more rows to knit! I’d do a dance around the house, except that every row takes me approximately 30 minutes to knit. 18 more hours till completion. I’m not sure whether to dance or cry.

This Time, a Knitted Tree

I haven’t decorated any other trees. So, instead, I thought I would show you where I am on the knitted Christmas Tree Skirt. Slowly, but surely, my knitted white tie is starting to feature a cabled tree.

In between cleaning the house and mixing up more cookie dough, I am knitting the Christmas Tree Skirt. OK, my progress is sad and pitiful, but it’s Christmas time. All I want to do is bake (I made brownies yesterday) and watch Christmas movies. I just love The Christmas Carol. I think I could watch it a million times and never get bored of it.

New Chart for Christmas Tree Skirt

While knitting up the sample of the white ties in the Christmas tree skirt, I realized that my original chart was not going to work. I could not stretch the tree branches out as far as I wanted to and still decrease every 4th row as was needed in order to match the other ties knit in the Naturally Spun yarn. Thus, I spent the last two days reconfiguring the layout of the tree.

Behold, the new Christmas tree chart.

The tree branches will be made with K1F’s (hold 1 stitch forward on cn, K1, K stitch from cn) and K1B’s (hold 1 stitch back on cn, K1, K stitch from cn). The trunk consists of 3 stitches that are knit in stocking stich. All other stitches are knit in reverse stocking stitch. (cn = cable needle)

I hope to post a picture soon of the newly designed, white wool tie.

Update pic on the AWHF Shawl

I’m stealing Tracie’s name. One of her recent crochet projects was called the Dress that Never Ends. My AWHF Shawl will henceforth be known as the Shawl that Never Ends. It’s a good name.
I am only 75% done. Wait. Let me rephrase. Hark, I have knitted 75% of the shawl. Gosh, that sounds better, doesn’t it?
Every 4th row now requires 16 sead beads to be woven in. Thus, every 10 stitches, I have to stop and move one bead towards the top of the string and slip two stitches. I am grateful every time I finish a beaded row and can then knit 3 rows plain. As a bit of good news, it appears that I have enough beads strung onto the cone to last me till the end of this shawl.
Enough of me yammering, let’s have that pic, shall we?

And without the light
Gosh, you can’t see all the beads in either one of them. There is sweat and tears on each one!
I’ll have to find another way to take a pic of it before I publish the pattern on it.

Pine Tree design on Christmas Tree Skirt

I have the laptop back! This guy moves so much faster than Hal! Yet in my excitement of having the laptop back, I forgot to snag the digital camera. And, what’s a blog without pictures? So, I made you a picture.

What is it you ask? Why it’s a pic of my design for the white ties in the Christmas Tree Skirt.

I’ve cast on for the 1st of the white ties. I’m pleased that my design/calculations allow for all the ties to start in the same manner. I don’t mind doing the extra math, but I think it’s easier on the knitter if s/he doesn’t have to check the pattern constantly.

More pictures later:

  • The Chili Pepper quilt is finished!
  • Progress on my never-ending-beaded-shawl (It’s getting bigger – I swear!)

Have a great weekend!

I’ll be out on the roads doing some more Christmas shopping. Will I finish? Heck, no, but I’ll have more done than undone. And that seems like an accomplishment.

Christmas Tree Skirt, the 1st tie

The 1st of 9 ties is downstairs being blocked.

I just love the way this tie came out. The colors are gorgeous and so little work was required by me to make the yarn shine. I must tip my hat again to Brenda for hand-dyeing and hand-spinning this fiber for me. My MIL has asked me why I don’t try my hand at dyeing. My answer is because I could never have my yarn look like this. My time is better spent listening to the yarn and manipulating it into various shapes.

I will cast on for the white tie next week, which will feature a cabled pine tree in its center.

My plan is to complete the pattern with just 2 of the 9 ties being knitted. If we wait for me to complete knitting all 9 ties, there won’t be enough days left for any knitter to purchase the pattern and complete the skirt before Christmas is here. Additionally, I will offer the pattern at a discount, since it will take a small leap of faith from the knitter to believe that the 2 knitted ties make up a 50-inch diameter tree skirt.

Accomplishing Nothing

I was hoping by my next post I would have something … anything! … to show you, but I come to you empty-handed.

The mohair stole is still not finished. I measured it on Friday and it was at 59 inches. I measured it last night and it was only at 60 inches. I thought for sure I knit more than an inch. I think it hates me. However, I do have wonderful news about the mohair. It seems that if you don’t try to fight with it, it self-patterns very nicely. Amazing, isn’t it?

The Christmas Tree Skirt has been frogged and recast on. My gauge was only off .25 of an inch from my swatch, but, oh, what a difference it can make.

Progress on my Alpaca Beaded Shawl is at a snail’s pace now. Each row keeps getting longer and longer as I near the top of the shawl. Plus, every 4th row requires the weaving in of 14 beads. I used to get excited for the bead rows (every 4th row) back when I only had to weave in 4 beads. Now, I get excited every time I finish a beaded row. And when faced with too many beaded rows, I pick up another project.

Let’s not even talk about my Mystery Project and the (lack of) progress on it. I’ve had two people stop by on Ravelry and let me know they’re excited to see what I create. Even my MIL asked me how the project was coming, since I had her running around Maine searching down the missing yarn for it. I am plagued with guilt and still I can’t bring myself to pick the needles back up. I HAVE to finish the stole, shawl, and xmas skirt first. Should I mention that I have wicked thoughts about knitting a scarf for my SIL? Somebody talk some sense into me, would ya?!

The Chili Pepper quilt is still missing its binding. The binding tape is laying on top of the quilt right now, but for some reason it won’t attach itself. Ungrateful thing that it is.

Baby Flick’s quilt still requires more machine quilting before I can stitch the binding on. Of course, I should mention that I haven’t even started to cut out the binding strips. Let’s not even talk about who is going to hand-stitch the binding to the back of the quilt. I’m on a hunt for that little green elf!

The Dining Room Roman Shades are still sitting in the sidelines waiting patiently for me to finish Baby Flick’s quilt.

And to prove it, here is a pic of my sewing room.

What have I accomplished?


I raked all the leaves up.

I stuffed a Pumpkin Man.

I put away our summer clothes and drug out the winter sweaters.

I took Jake to the vet. Poor guy has a double ear infection.

I did knit on the stole, shawl, and tree skirt, but they are mocking me now.

Casting on for Christmas

Christmas has begun in my home!

I have already crossed 9 people off my Christmas list. Only 15 more left to shop/make for. Which doesn’t sound like a lot until you start accounting for all the birthdays that occur in November and December. Most of the people on my list have to bought for twice.

I have garnered permission from Dan (my husband) and encouragement from my neighbor to put up two Christmas trees this year. The plan is to trim the artificial Christmas tree before Thanksgiving. We’ll get a real one after Thanksgiving Day. Plus, I already won the argument last year about The Wise Men Day (January 6th). The tree has always had to stay up till Jan. 6th because I won’t let him take it down beforehand, but last year was the first year we actually swapped one small present on the day. I lobbied that we make it a tradition … and Dan agreed. So, I get almost a full 2 months of Christmas! I’m soooo giddy. I can’t wait for Halloween to come and go.

But enough about my crazy Christmas habits, the main reason I wrote up this post was to show you that I have finally cast on for the Christmas Tree Skirt.

My love of cables has kept the tie point from curling.

And after fighting with my mohair stole over the hand painted yarn getting stuck in a rut, I am relieved to be working with yarn that nicely flows from one color to the other.
Thank you, Brenda!

Borrowing my Husband’s Tie

My husband came home from work yesterday and gave me the funniest look. I don’t know why. Don’t all women wear their husbands ties in the house when they’re not home?

No? Well, they ought to. Ties are great for inspiration. The one I wore yesterday helped me design the schematics for the Christmas Tree skirt. Here’s the proof.

What else did I do when I was supposed to be watching the Phillies playoff games? I was knitting more of the mohair stole, because watching the Phillies play the way they are is depressing. We can’t pitch to save our lives and our hitters are lost in la-la-land. Ung. But enough about that, I was telling you about my mohair stole. It is 40% completed!

Well, I am off to make a pot of chili. It’s still hot as heck here in Pennsylvania, but I’m doing my part to encourage the weather to get cooler. Stew = cold weather. Truly, it feels like we have been living in San Francisco these past 3 days. Every morning, we get a foggy, misty drizzle (I wouldn’t even call it rain) followed by 80+ degree F day. I guess it is better than no rain at all and if the heat would just go away – I’d be happy as a lark or a Jake. =)